Neop
Neop

Neop · Installing Neop access-control equipment

Installing Neop access-control equipment

Plan your Neop installation with an electrician, locksmith, your own technical team or an installation partner. Prepare gates, connectivity and power.

Who can install the equipment?

The skills required depend on your configuration. Wired and 4G installations require appropriate low-voltage electrical competence; other mechanical fitting tasks may require a locksmith or a suitably experienced technical team.

Neop provides technical documents with the quote so your team can assess the work. We also work with installation partners in several regions.

Prepare installation together

  1. 1

    Review the site

    Share gate photos, plans, power availability and connectivity details.

  2. 2

    Confirm equipment

    Check the hardware, mounting and electrical requirements with the installer.

  3. 3

    Plan commissioning

    Arrange the Neop presentation and commissioning session before the equipment is put into use.

Let’s discuss your project

Tell us about your facilities, access points and booking tools. Our team will help you identify the right equipment.